Energy Markets
Romania signs main engineering agreement for two atomic power plants
Romanian stateowned nuclear power producer Nuclearelectrica signed the main engineering contract to include two more reactors at its plant in Cernavoda on the Danube river with a consortium of four firms, it stated on Friday. The European Union state presently has 2 706-megawatt (MW). reactors which utilize Canadian CANDU innovation, owned by. AtkinsRealis, formerly referred to as SNC-Lavalin group, accounting. for a fifth of Romania's power production. It prepares to include 2 more 700 MW reactors using the same. innovation by 2031 and 2032, respectively. Energy Minister Sebastian Burduja has said the contract,. which was signed on Friday at COP29...