Latest News

US PJM worried brand-new generation not coming online quick enough

PJM Interconnection, the greatest U.S. power grid operator, stated on Thursday that it anticipates to fulfill this year's summer demand but generator retirements and increasing demand persistently wear down reserve levels for the operator.

The power grid operator kept in mind that in cases of severe heat and considerable generator failures, tighter reserves might trigger the use of need action or additional emergency situation procedures.

PJM deals with a decrease in available generation resources compared to the previous year.

About 182,500 megawatt (MW) of installed creating capability is accessible to satisfy consumer demands, whereas last summertime, there was around 186,500 MW of installed capability

We plan throughout the year to make certain we have enough resources to serve load at the most popular time of the year, PJM President and CEO Manu Asthana said in a declaration.

But we are worried that brand-new generation is not coming online fast enough to change retiring resources, and that subsequent years may be more tough.

PJM also anticipates higher peak demand for electricity this summertime at around 151,000 MW versus the 2023 summertime peak load of 147,000 MW. The operator's all-time, one-day highest power usage was at 165,563 MW, which was tape-recorded in the summer of 2006.

One megawatt can power around 1,000 U.S. homes on a typical day.

(source: Reuters)